View source | Discuss this page | Page history | Printable version   
Main Page
Upload file
What links here
Recent changes

PDF Books
Show collection (0 pages)
Collections help



The date and shift during which a particular quality control point is documented, as well as the time when the check took place. Also a contact name is entered:

The Create CCP button is used to automatically populate the information in the Check Point Set and Time tabs about the check(s) that are configured to take place during the selected shift.

Once the above action has been executed, the Edit CCP Measured Values button appears. When clicked a popup appears in which the value of the check is entered:

After entering the value and clicking the ok button, the entered value appears in the Values tab.

Once the value has been entered this way, the Input Time Measurement button appear. When clicked a popup appears to process the information entered in the time tab:


Retrieved from ""

This page has been accessed 373 times. This page was last modified on 13 February 2012, at 15:20. Content is available under Creative Commons Attribution-ShareAlike 2.5 Spain License.