View source | Discuss this page | Page history | Printable version   
Toolbox
Main Page
Upload file
What links here
Recent changes
Help

PDF Books
Show collection (0 pages)
Collections help

Search

ManualDoc:T800253

In this tab the applicable transactions are entered on separate lines. For each transaction type, it is possible to define whether transactions are considered for the whole time horizon on the Manufacturing plan and Purchasing Plan or just a part:


Also, a percentage of the quantity to be considered by MRP is configured with the Weighting. If a sales forecast for 100 units is entered with a weighing of 0.9, only 90 units are reflected in the Manufacturing plan or Purchasing plan. Likewise, a value above 1 can be entered to include a higher number in the plans.
WS800253.png

Retrieved from "http://wiki.openbravo.com/wiki/ManualDoc:T800253"

This page has been accessed 601 times. This page was last modified on 4 February 2014, at 18:35. Content is available under Creative Commons Attribution-ShareAlike 2.5 Spain License.